A manufacturing facility with an 11,000m² Kingspan roof, put on in five days.

A manufacturing facility at Eurocentral for Muir Construction. Its 11,000m² Kingspan KS1000RW roof, with Kingspan DLTR rooflights, went on in five days. The walls are Kingspan KS1000RW and Kingspan Microrib.

The flashings and trims were cut and folded in our Irvine workshop.

Where
Manufacturing facility, Eurocentral
Materials
Kingspan KS1000RW, Kingspan Microrib, Kingspan DLTR rooflights
Client
Muir Construction
The long side of the factory, silver over dark grey, with the office entrance
The end wall and loading door, with silos alongside
The office end of the factory, with its entrance canopy